How to Safely Load and Transport Heavy Equipment
How to Safely Load and Transport Heavy Equipment
Creating set loading, transportation, and unloading standards and practices is essential when handling large machinery and keeping people safe. Find guidelines below for the proper loading and unloading of heavy equipment to help you safely haul construction and heavy machinery.
Luyi contains other products and information you need, so please check it out.
Contact us
What Safety Steps Should You Take Before Transporting a Load?
Preparation is key for heavy equipment transport. Construction injuries can occur when loading and unloading equipment, so it’s essential to prepare and take safety measures from the start to mitigate liabilities and avoid construction accidents. Let’s review the proper ways to prepare heavy equipment for transport.
1. Perform a Documented Risk Assessment
Regarding heavy equipment liability, construction companies are responsible for dotting their i’s and crossing their t’s. Risk assessments are preemptive compliance documents allowing you to prove how detailed and thorough your fleet management processes are.
Consider adding one for your heavy equipment transportation preparation protocol. They can be done by a senior manager or supervisor, containing the total operation and transportation timeline and its weight loads, plus relevant project risks and what’s been done to address them.
2. Outfit Sites With PPE
We can’t say it enough — safety is the backbone of the industry. Having your crew wear a complete set of personal protective equipment is a safety standard across all construction operations, not just when preparing for the safe and legal transport of heavy cargo. It’s also something routinely overlooked, with many sites taking shortcuts to chain up a trailer quickly and move on to the next task.
PPE documentation is also a risk-mitigation strategy. You’ll round out a stronger risk assessment and permit application when you note all the safety protocols you and your crew adhere to on top of routine tie-down requirements for heavy equipment.
3. Inspect the Hauling Capacities of Your Truck or Trailer
Next in line when preparing for heavy equipment transport is to check the things that’ll be doing the actual transporting. A complete inspection of your trailer or truck includes the following:
- Tires: Assess the condition of your trailer and truck tires, notably for tire pressure. Multi-ton machines take a toll on tire air pressure and will quickly deflate any that are already weak.
- Lights: Front and brake lights should work without a hitch.
- Brakes: Similar to tires, your oversized load affects your vehicle’s braking abilities. Assure all brake functions and components are in good shape.
- Tie-Down Points: Check your load’s required point number, securement condition, and spacing. Most states’ standards mandate a minimum of four tie-down points for loads exceeding 10,000 lbs, each with its own binder or boomer and individual chains connected to trailer hitch points. These boomers are responsible for supplying the tension to tighten the actual chain connection and, as such, should be inspected themselves.
- Weight: Confirm your tie-down working load limits add up to at least half of the total weight of your load.
While most states mandate four tie-down points, and most operations concede to that number, some heavy equipment requires even more. Any machine with attachments or appendages must have those attachments dislodged and separately secured, meaning now a minimum of five tie-down points. A typical example of this is when securely transporting excavators.
How to Load Heavy Equipment Safely
A load is only as strong as its weakest link. Weak links often happen because the process was rushed or done halfheartedly, not because the procedure wasn’t followed.
Loading heavy equipment on a trailer safely is not just about driving a new dozer up the ramp, looping in a few chains, and sending it on its way. We’ve got a few more points of consideration to ensure you reliably and legally transport heavy cargo. Refer to these safety measures for secure loading operations.
1. Designate Responsibilities
Before actual loading occurs, the team should have a clear understanding of who’s in charge of what. You’ll need someone to drive the equipment onto the deck, but you’ll also need a spotter to deliver hand signals and direct the driver up the ramp and onto the trailer bed. Likely, they won’t have a clear line of site to do so themselves.
Moreover, the rest of the crew should be notified if a loading procedure is on the docket. No drifting personnel or other vehicles should interrupt loading operations, which are generally unsafe to stop once they have started.
2. Clean the Ramp and Trailer
Ramps and trailer decks should be as dirt-, oil-, and debris-free as possible, especially if they are metal. This ensures the piece of loading equipment has as much traction as possible to move up its ramp. A clean ramp and trailer bed are also dry, and clear of ice, snow, and water. If you are still concerned about equipment smoothly moving up ramps, consider employing ramp friction devices during this step.
3. Clear and Level the Loading Area
Pick an uninhabited and even space to set up the ramp and perform heavy equipment loading. Again, this is intuitive, but amid a busy workday or at peak hours in the yard, such measures can fall by the wayside.
You’ll also want to ensure the actual ground in the loading area is compact enough to bear the total weight of your loaded trailer. After rain or during seasons with thaw, the combined weight of these two vehicles can cause sinkage.
4. Begin the Machine/Ramp Line-Up
Slow and steady is the name of the game here. With the driver in the cab and a spotter positioned in plain view, begin driving the heavy equipment up the cleared ramp and onto the transportation vehicle’s deck.
Note that the machine’s center of gravity will shift during this ramp movement. This is the most dangerous part of the loading process, with the equipment’s weight caught momentarily in a point of limbo. Just keep moving gradually.
Also note that when appropriately positioned at final rest on deck, most of the equipment’s weight should be distributed toward the front of the trailer. This avoids fishtailing while en route.
5. Start Chaining Down Heavy Equipment
Check state laws on securing heavy equipment during public highway transportation. While the 4-5 tie-down points are near-universal, each state has additional oversized cargo restrictions and regulations to respect.
With the heavy equipment safely positioned on the deck, you can initiate one of the most critical steps in the loading and unloading procedure — tying it down.
There are three predominant concerns with chaining down:
- Tight, secure chains: Your chain should have no room for movement. Equipment shouldn’t be able to bounce or shift during transport.
- Properly located tie-down points: Most manufacturers will create labels for the tie-down points to make them easier to follow. Be especially careful if these are by a machine’s hydraulic hoses, cylinders, or brake components, though. Tying down heavy equipment at appropriate points prevents equipment damage and ensures the tightest, most compliant links.
- Adequately matched chain and hook binder grades: If you look closely at every 4-5 chain links, you’ll find a number etched into the metal. Cross-reference that number with the one printed on the boomer handle, ensuring they’re aligned. The sum of the working load limits of all your tie-down components must equal at least 50 percent of the weight of the cargo. Always ensure the chain’s grade and working load limit don’t exceed the boomers’ listed limit.
Here are a few additional reminders to achieve the proper way to chain down an excavator, loader, and more:
- All chains fastened linearly, with downward force, with no horizontal twists, bends, or angles
- No slack. Wrap the excess chain around the rest of the link so it won’t come loose.
- At least four chains in use. Use two connecting to the trailer’s front corners and two to the trailer’s back corners. The tension from these opposing forces should keep the equipment in place.
- Always review chain and hook sizes. You need to guarantee they’re complementary and tight, not mismatched.
How to Transport Heavy Equipment Safely
Vehicle accidents due to heavy trucks and cargo transport cause injuries and fatalities every year. This merely reinforces how vital it is to follow proper loading and unloading heavy equipment procedures in the yard and safely haul that equipment while on the road. We’ve got a few strategies.
1. Map the Best Route
Mapping your route before transporting your heavy equipment helps avoid accidents, such as trying to pass under an overpass that’s too short for your transport vehicle. You can also perform a run-through of your route to ensure there are no obstacles.
Look at the width of the road and bridge analysis to create the safest transportation route for your heavy equipment. The fewer turns, starts, stops, bridges, or challenging terrain can make the trip go smoothly and keep your drive, equipment, and passersby safe.
2. Apply for a Transportation Permit
This is especially important if your load qualifies as oversized or overwidth, which — let’s face it — most heavy construction equipment will. Cranes, excavators, dump trucks, graders, dozers, and scrapers are just a few that carry extra heavy equipment liability. Prepare accordingly, whether that means deconstructed transport strategies that avoid overwidth or overweight designations or applying for the proper state permit from the onset.
3. Immobilize Equipment Wheel Components
It takes a little extra time, but the security is worth it. Apply the equipment’s parking brake. Also consider using wedges, chocks, or cradles against equipment wheels, securing them in place and preventing them from rolling on deck. They will also bolster your defenses against the following weight-distribution forces that naturally occur during transport:
Contact us to discuss your requirements of Oil Equipment Hauling Lowbed. Our experienced sales team can help you identify the options that best suit your needs.
- Forward force: 80 percent of vehicle weight gets applied when braking during transport
- Rearward force: 50 percent of vehicle weight gets applied when accelerating, shifting gears, or reversing
- Upward force: Up to 20 percent gets applied when driving uphill or over bumpy terrain
- Sideways force: 50 percent gets applied when turning, lane changing, or braking while turning
This is also a great time to double-check any extra machine-specific loading and transportation conditions outlined by a spec sheet or manufacturer’s guidelines.
4. Outfit Heavy Equipment Transport Vehicles With Safety Signs, Labels, and Lights
If you’ve ever seen an oversized load on the highway, you’ve likely noticed they’re marked with large banners, signs, and plenty of lights. These safety additions help others on the road know to use caution when approaching and passing. Transporting oversized loads can require one or multiple escort vehicles that alert other drivers to keep themselves and the driver safe.
If transport trucks are working alongside escort vehicles, they communicate through CB or two-way radios to ensure prompt, safe communication. Outfitting your transport equipment with the proper signage, labels, and lights helps you safely haul equipment to and from your site.
5. Run and Document Inspections While En Route
Heavy cargo’s safe and legal transport doesn’t stop once you start the ignition. While your heavy equipment is on the way to your site, perform regular inspections and check-ins, especially if you’re transporting your heavy equipment across great distances.
Industry standards designate when you should perform check-ins or inspections while your heavy equipment is on its way to its destination:
- Stopping for check-in during the first 50 miles of travel.
- Stopping every three hours or 150 miles, depending on what comes first.
- Having the new driver run and document a full inspection at every change of driver or duty station.
How to Safely Unload Heavy Equipment
Safely unloading construction equipment rounds out the compliant transportation process. As with other protocols, there are key steps and risk-mitigation strategies to ensure the success of this final step.
1. Clear and Level the Unloading Site
Before your transportation vehicle arrives and you unload your equipment, inspect your designated unloading area to ensure it’s clear and ready for unloading. Uneven loading grounds and slick ramps can make unloading more challenging than expected, causing unexpected downtime or problems.
Do more than just clear any obstacles, debris, or dirt. Your personnel should also be aware of cargo schedules so only your relevant crew members are present when your heavy equipment arrives, making the process go more smoothly.
2. Do a Walkthrough
Once your transport vehicle arrives, guide it to the correct unloading site. Have the unloading ramp ready for deployment once the transport vehicle arrives, but you should conduct an additional visual inspection to ensure it’s clean and ready to go.
Once you’ve confirmed your ramp is ready for unloading, line up the ramp with the back of the trailer bed with as much accuracy as possible since you won’t have time to reposition once the machinery starts backing up.
Once you have everything in place, conduct a final walkthrough to better understand your equipment’s condition. Check the hitches and tires. You can also review roles and tasks with personnel, appointing an equipment operator and spotter before breaking down chain tie points.
Look at the condition of the tie points before you move forward with the unloading — a shifted load can create a hazard. If you’ve found that the load has shifted, hold off on undoing any chains or straps until you create a customized unloading plan.
3. Free the Load
After your walkthrough and determining that everything is in good order, slowly release tie-bounds and chains. Begin this process one at a time, starting in the rear corners. If any chains are wrapped around the links, unravel them and loosen them with their wrench boomers.
Use caution when starting this process since any chains can still be tight or pressurized. Moving too quickly can cause a metal chain to suddenly snap up if the tension isn’t reduced correctly.
4. Slowly Back the Heavy Equipment Down the Ramp
As you unload equipment, remember to take it slowly and to keep a safe distance between the spotter and the machinery. During the unloading process, your operator’s visibility can decrease until the equipment is fully unloaded, so ensure your spotter is positioned in a highly-visible but safe area. The rest of your personnel should stay away from the unloading site until your machinery has finished unloading since all attention should be on removing the equipment from the transport truck.
5. Wrap It Up
Do a final ground inspection of all equipment, the transport vehicle, anchor points, and tools before sending everyone on their way. Document the conclusion of the transport — and pat yourself on the back for successfully completing the safe and legal transport of heavy cargo.
Contact Thompson Tractor for Heavy Equipment in Alabama
Transporting construction equipment is no easy undertaking. We hope this resource has provided insight into its proper techniques and protocol for your heavy load securement and transportation operations.
Oilfield Transport Services: What You Need to Know
Oilfield equipment hauling requires care and consideration. Size and experience matter when it comes to moving this kind of machinery. You need a shipping partner who can do more than deliver, as oilfield equipment hauling requires safe transport, careful handling, and more. No matter whether you’re moving a single load of equipment or relocating an entire operation, a strategic freight partner is essential.
What does oilfield equipment hailing involve? In many cases, you need an expert heavy haul partner to make the move. A flatbed or lowboy trailer is essential equipment and rigging must be secure. Additionally, oilfield equipment often exceeds weight and size limitations, so pulling the proper permits and careful route planning are important considerations.
Ready to learn more about how a strategic partner can help get your oilfield equipment shipped? See how a strategic freight partner with the right trucking services can get your goods to your next job site.
What is Oilfield Equipment?
The oil and gas industries are complex, as is the equipment used in the field. Oil drilling is a complicated process and takes specialized equipment and machinery. Oilfield equipment is used in the process of extracting oil from the ground. You’ll find that oilfield equipment is often engineered with precision and is designed to be safe, efficient, and environmentally friendly.
Common types of oilfield equipment include:
- Shale shakers: A shale shaker is used to separate the large solid pieces in the mud or drilling fluid.
- Degassers: Degassers get the air bubbles and gasses out of the drilling fluid. Gasses like hydrogen sulfide, methane, and carbon monoxide can make the drilling and extraction processes dangerous, so it is essential that they are removed. There are two main types of degassers: vacuum degassers and atmospheric degasses.
- Mud cleaners: Just as shale shakers remove solid pieces from the mud or drilling fluid, mud cleaners are mesh screens that prevent solids from entering the mud.
- Sand pumps: A lot of different pumps are used in the oil extraction process. Sand pumps move mineral and sand deposits away from the oil drilling site.
- Stabbing guides: Pipes need to be in careful alignment to extract oil. Stabbing guides can help ensure everything is lined up properly.
You’ll likely find other kinds of oilfield equipment in use at extraction sites. Much of the equipment used on an oilfield is quite large and can weigh thousands of pounds. It takes a careful and trusted transport partner to move oilfield equipment from site to site.
How Do You Move Oilfield Equipment?
Because of its dimensions and weight, oilfield equipment hauling takes careful coordination. You’ll likely need a heavy haul trucking partner to move oilfield equipment. A heavy haul trucking partner has access to the tools you’ll need to move the equipment to and from the field or job site.
You’ll need a partner with access to the right tools when it comes to oilfield equipment hauling. Specialized trucking equipment is essential. A flatbed truck or lowboy trailer can come in handy. You’ll also need to use the right rigging to keep the equipment in place during transport. You might even need a crane to load the equipment on the truck for transport, too. You’ll know you have the right carrier for the job when they are prepared with the proper tools for oilfield equipment hauling.
You might find that your oilfield equipment exceeds weight and size limitations. This means you’ll need the right permits and route plans in the state your oilfield equipment is transported through. The right freight broker or transport partner will work out these details for you. From making sure fees are paid to pulling the proper permits, seek out a strategic partner who is ready to handle the details and do the legwork.
For example, you’ll need to follow a few rules if you need oilfield equipment hauling in Colorado. Permits are needed for transport. Most oversize and overweight loads can only be on the roads from dusk until dawn, with a few exceptions, in The Centennial State. Additionally, your load cannot exceed 80,000 lbs when traveling on the interstate or 85,000 lbs when taking a non-interstate route.
These rules and regulations mean careful planning is in order when hauling oilfield equipment. See why leaving the planning to your strategic transport partner can make oilfield equipment hauling an easy job. No matter whether you’re transporting equipment to the next drill site, returning equipment for recovery shipping, or even purchasing new machinery from a manufacturer or even an auction, see how a strong freight partner can get your goods and equipment on the move.
Oilfield Transport Services with Heavy Haul and Oversized
Ready to find a freight partner ready to do the heavy lifting? Let Heavy Haul and Oversized show you how they’ve built their reputation as an industry leader from the ground up.
How has Heavy Haul and Oversized excelled in the heavy haul trucking sector? By helping businesses overcome challenges. From making sense of the rules of the road to providing the right equipment the first time, let a leader go to work for you.
See how Heavy Haul and Oversized can put in the work when you need oilfield equipment hauling services. The team at Heavy Haul and Oversized is ready to meet your oversize shipping needs with the right carriers and right equipment for the job. Individual needs can vary from load to load, and we’re ready to step up with scaled solutions.
Available equipment and shipping services can include:
Are you interested in learning more about Transformer Transport Lowbed? Contact us today to secure an expert consultation!
- Removable Gooseneck (RGN)
- Flatbed Shipping
- Lowboy Trailers
- Catastrophic Recovery Shipping
- Stepdeck Trailer Transport
- Double Drop Deck Trailers
- Cargo Handling Equipment